108 results from Projects
Filter by:
A77 Park End to Bennane Improvement Project
ProjectThere will be a widening of approximately 2.9km of existing Trunk Road to provide alternating dedicated northbound and southbound overtaking lane.
A77 Symington and Bogend Toll
ProjectThis £10.6 million project involved the construction of grade separated junctions along one of Scotland’s key routes on the A77 in Ayrshire.
A82 Allt Chonoglais Bridge Replacement
ProjectThis £1.8 million project replaced the previous structure with a stronger bridge. The improvement was part of the A82 Bridge Strengthening & Replacement Programme and the new bridge was opened to traffic on 15 August 2013.
Media Results
A82 Ba Bridge Replacement
ProjectA survey identified the A82 Ba Bridge as being under strength to carry future traffic loads and it was replaced by a stronger structure. A 52 week contract, awarded in January 2010 to RJ McLeod, was completed ahead of schedule in December 2010.
A82 Crianlarich Bypass
ProjectA new bypass has been constructed where the A82 and A85 meet at Crianlarich, to tackle the congestion experienced by road users during the busy tourist season.
A82 Improvements
ProjectTransport Scotland is operating an improvements programme to address a number of long-standing issues along the route of the A82.
A82 Pulpit Rock
ProjectThe improvement work at Pulpit Rock has seen the removal of traffic signals and the re-introduction of two-lane carriageway.
A82 Stuckindroin Bridge
ProjectThis £1.1 million project upgraded the bridge, widening it to accommodate future traffic flows and easier maintenance.
A82 Tarbet to Inverarnan
ProjectTransport Scotland have commissioned Jacobs Fairhurst Joint Venture to look at options to upgrade the A82 between Tarbet and Inverarnan.
A82 Wellington Lay-by Allt Cumhang Wall
ProjectThis lay-by is a popular stopping point for tourist traffic, with a convenient location from which to view Loch Ness.