The A6091/A7 Trunk Road (Selkirk) (Temporary Prohibition on Waiting, Loading and Unloading) Order 2021

The Scottish Ministers give notice that they have made the above Order under sections 2(1) and (2), 4(1) and 14(1)(a) and (4) of the Road Traffic Regulation Act 1984, temporarily prohibiting waiting, loading and unloading on that length of the A6091/A7 Melrose – Galashiels – Carlisle Trunk Road being the southbound and northbound carriageways between the junction with High Street, Selkirk, to the junction with Russell Place, Selkirk, a total distance of 610 metres or thereby.

The Order, which is required to allow resurfacing works to be carried out will be in operation from 10 May until 15 May 2021 and will only have effect in relation to such part or parts of the length of road as is indicated by the appropriate traffic signs. Pedestrian access will be maintained at all times.

The Order does not apply to vehicles being used in an emergency for fire brigade, ambulance, police or coastguard purposes or a vehicle being used for carrying out the works.

Alternative routes

An alternative route is not required.

For information about roadworks on motorways and trunk roads visit www.trafficscotland.org.

A member of the staff of the Scottish Ministers
Transport Scotland
Buchanan House
58 Port Dundas Road
Glasgow
G4 0HF


Start date 10 May 2021 End date 15 May 2021 Status Region