858 Publications

Filter by:

High Speed Rail Strategic Business Case

27 Oct 2009

The case for the High Speed Rail link to extend to Scotland

A82 Crianlarich Bypass: Environmental Statement

24 Sep 2009

The proposal is for a western bypass that would leave the A82 near the southern edge of the town and rejoin the A82 immediately west of the village

Transport Scotland Business Plan 09/10

23 Jun 2009

The Business Plan sets out the specific tasks for the year ahead (2009/10) and what we aim to achieve. Published on 23 June 2009

A90 Balmedie to Tipperty - Stage 2 Addendum Report

5 May 2009

In 1995 a report was produced for the dualling of the A90 between Balmedie and Tipperty. This document provides an addendum to the report by updating the original baseline information for the study area and describes the appraisal of new sub-options

A82 Dalnottar-Inverness Trunk Road Environmental Statement - Non-Technical Summary 2009

30 Apr 2009

A82 Dalnottar – Inverness Trunk Road - A82 Ba Bridge Replacement Environmental Statement 2009 Non-Technical Summary

A82 Dalnottar-Inverness Trunk Road - A82 Ba Bridge Replacement - Environmental Statement 2009

30 Apr 2009

A82 Dalnottar - Inverness Trunk Road - A82 Ba Bridge Replacement - Environmental Statement 2009

Forth Replacement Crossing: DMRB Stage 2 Corridor Report: Volume 1 (Main Report and Appendices)

16 Apr 2009

The first volume of the Design Manual for Roads and Bridges Stage 2 Corridor Report for the Forth Replacement Crossing, including the main report and appendices

Forth Replacement Crossing: Main Crossing (Bridge) Scheme Assessment Report Development of D2M Alternatives

14 Apr 2009

Report on the assessment of options for a narrower replacement crossing to carry a dual carriageway road with hard shoulders

Forth Replacement Crossing: Forth Road Bridge Feasibility of Multi-modal Corridor

14 Apr 2009

Report on the feasibility of utilising the existing FRB for non motorised and public transport/light road traffic, incl for a potential future guided bus/tram/light rail facility

Forth Replacement Crossing: Main Crossing (Bridge) Scheme Assessment Report Development of Options

14 Apr 2009

Report on the assessment of options for the outline design of the replacement crossing

Page 83 of 86