784 Publications
Filter by:
Airdrie-Bathgate Rail Link Improvement Stage 1 Outcome Evaluation Report
19 May 2015This evaluation report provides an early assessment of the extent to which the project is on track to reach its objectives, through the examination of relevant monitoring data
Improving the evidence base on journey time reliability on the Trunk Road Network in Scotland
15 May 2015The study looked at the concept of Journey Time Reliability and its valuation
Road Safety Framework: Annual Report 2014
11 May 2015The annual report for Scotland's Road Safety Framework
Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen
6 May 2015The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015
DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen
1 May 2015Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.
Quarterly newsletter No. 1 - 2015 - AWPR
22 Apr 2015A quarterly newsletter will be available via local libraries throughout the north east
Durability of White Thermoplastic Road Markings
20 Apr 2015Research to look into durability of Thermoplastic Road Markings (TRM) in particular around durability issues in relation to the premature “wearing off” properties of the TRMs.
M74 Completion Scheme: One Year After Opening Evaluation
26 Mar 2015This report presents the one year after opening evaluation for the M74 Completion Scheme
Dealing with Tar Bound Arisings and Producing a Safe System of Work
20 Mar 2015Desktop study to produce updated national guidance for all roads authorities and statutory undertakers on to deal safely and cost effectively with tar bound arisings.