784 Publications

Filter by:

Airdrie-Bathgate Rail Link Improvement Stage 1 Outcome Evaluation Report

19 May 2015

This evaluation report provides an early assessment of the extent to which the project is on track to reach its objectives, through the examination of relevant monitoring data

Improving the evidence base on journey time reliability on the Trunk Road Network in Scotland

15 May 2015

The study looked at the concept of Journey Time Reliability and its valuation

Road Safety Framework: Annual Report 2014

11 May 2015

The annual report for Scotland's Road Safety Framework

Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

6 May 2015

The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015

DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen

1 May 2015

Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.

Quarterly newsletter No. 1 - 2015 - AWPR

22 Apr 2015

A quarterly newsletter will be available via local libraries throughout the north east

Durability of White Thermoplastic Road Markings

20 Apr 2015

Research to look into durability of Thermoplastic Road Markings (TRM) in particular around durability issues in relation to the premature “wearing off” properties of the TRMs.

M74 Completion Scheme: One Year After Opening Evaluation

26 Mar 2015

This report presents the one year after opening evaluation for the M74 Completion Scheme

Dealing with Tar Bound Arisings and Producing a Safe System of Work

20 Mar 2015

Desktop study to produce updated national guidance for all roads authorities and statutory undertakers on to deal safely and cost effectively with tar bound arisings.

Project newsletter - Spring 2015 - M8 M73 M74

6 Mar 2015

Page 64 of 79