Economic, Environmental and Social Impacts of Changes in Maintenance Spend on the Scottish Trunk Road Network

Appendix C Pavement Network Model outputs

This Appendix contains the outputs from the Transport Scotland Pavement Network Model prepared by WDM Ltd:

  • Scenario 1 (Base case): Constant annual level of spend (2010/11 funding level continues) for 20 years
  • Scenario 2: Reduction in the annual spend in Scenario 1 by 20% (starting 2010/11) for the first 10 years. Return the annual spend to current 2010/11 levels using annual uniform increases, between 2020 and 2025. From 2026, increase annual funding by 2.5% per year
  • Scenario 3: Reduction in the annual spend in Scenario 1 by 40% (starting 2010/11) for the first 10 years. Return the maintenance budget to current 2010/11 levels using annual uniform increases, between 2020 and 2025. From 2026, increase annual funding by 2.5% per year

Scenario 1: Maintain with current expenditure £46.4m

Work Area Table Total

Maintenance Activity

Area of Work (m2)

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Reconstruction

555874

519650

535330

547636

627584

596462

634640

646685

641298

656200

Strengthening

958647

1123071

1051473

1012786

637850

815521

637551

581845

605011

509911

Surface dressing

467405

468328

474663

474817

474756

475954

475857

476585

476736

477112

Maintenance Activity

Area of Work (m2)

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

Reconstruction

644009

646271

649337

640786

656765

650620

656487

638622

617143

612949

Strengthening

627372

567471

549909

604233

508356

536991

505534

595801

713385

731714

Surface dressing

438661

500137

501636

502136

502123

502436

502727

502926

502738

502761

Financial Plan Table Total

Maintenance Activity

(£m)

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Reconstruction

20

17

18

19

25

22

25

25

25

26

Strengthening

23

25

24

23

18

20

18

17

17

16

Surface dressing

4

4

4

4

4

4

4

4

4

4

Total

46

46

46

46

46

46

46

46

46

46

Maintenance Activity

(£m)

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

Reconstruction

25

26

26

25

26

26

27

25

23

23

Strengthening

18

17

16

17

16

16

16

17

19

19

Surface dressing

4

4

4

4

4

4

4

4

4

4

Total

46

46

46

46

46

46

46

46

46

46

Condition Summary Table - Deflectograph & SCANNER

Road Type

Deflectograph & SCANNER PI

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Motorway

21%

26%

25%

25%

25%

24%

22%

21%

18%

16%

Dual APTR

18%

21%

21%

23%

24%

24%

24%

24%

23%

23%

Single APTR

9%

11%

11%

12%

13%

14%

15%

16%

16%

18%

Overall

11%

14%

14%

15%

16%

17%

17%

17%

17%

19%

Road Type

Deflectograph & SCANNER PI

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Motorway

14%

13%

12%

12%

11%

10%

9%

9%

8%

7%

6%

Dual APTR

22%

20%

19%

18%

16%

15%

14%

12%

11%

9%

8%

Single APTR

18%

18%

18%

19%

19%

19%

19%

20%

20%

20%

21%

Overall

18%

18%

18%

18%

18%

18%

17%

17%

17%

17%

17%

Condition Summary Table - SCRIM

Road Type

SCRIM PI

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Motorway

5%

4%

4%

4%

4%

4%

4%

4%

5%

5%

Dual APTR

13%

12%

12%

12%

12%

12%

11%

11%

11%

11%

Single APTR

29%

29%

29%

29%

30%

30%

30%

30%

29%

29%

Overall

24%

24%

24%

24%

24%

25%

24%

24%

24%

24%

Road Type

SCRIM PI

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Motorway

5%

5%

5%

5%

5%

5%

5%

5%

5%

5%

5%

Dual APTR

12%

12%

12%

12%

12%

12%

12%

12%

12%

12%

13%

Single APTR

29%

29%

29%

29%

28%

28%

28%

28%

29%

29%

29%

Overall

24%

24%

24%

24%

23%

23%

23%

23%

24%

24%

24%

Scenario 2: 20% reduction in current expenditure to £37.12m

Work Area Table Total

Maintenance Activity

Area of Work (m2)

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Reconstruction

436885

438968

442139

447997

499794

485553

507764

516657

511529

522821

Strengthening

710532

704613

687260

674355

430105

508138

404421

366023

390112

327470

Surface dressing

494168

495134

501648

501387

500998

501829

501626

501775

501848

502138

Maintenance Activity

Area of Work (m2)

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

Reconstruction

546973

583967

618043

642410

686649

700490

724786

733472

741486

762487

Strengthening

459392

403805

390741

433534

368454

393798

376942

438032

504992

511507

Surface dressing

369239

404103

405546

406288

406445

407073

407533

407927

408060

408390

Financial Plan Table Total

Maintenance Activity

(£m)

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Reconstruction

16

16

16

16

20

19

20

21

21

21

Strengthening

17

17

17

17

13

14

13

12

12

11

Surface dressing

4

4

4

4

4

4

4

4

4

4

Total

37

37

37

37

37

37

37

37

37

37

Maintenance Activity

(£m)

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

Reconstruction

22

24

26

27

29

30

31

31

31

32

Strengthening

14

13

14

15

14

15

14

16

17

17

Surface dressing

3

3

3

3

3

3

3

3

3

3

Total

39

41

43

45

46

48

49

50

51

52

Condition Summary Table - Deflectograph & SCANNER

Road Type

Deflectograph & SCANNER PI

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Motorway

21%

26%

26%

27%

28%

28%

27%

26%

24%

23%

Dual APTR

18%

21%

21%

23%

26%

26%

27%

28%

27%

29%

Single APTR

9%

11%

11%

12%

14%

16%

16%

18%

18%

21%

Overall

11%

14%

14%

15%

17%

18%

19%

20%

20%

23%

Road Type

Deflectograph & SCANNER PI

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Motorway

21%

20%

18%

17%

15%

14%

12%

11%

9%

8%

6%

Dual APTR

28%

28%

27%

27%

27%

27%

26%

26%

25%

25%

24%

Single APTR

22%

22%

23%

23%

24%

24%

24%

25%

25%

25%

26%

Overall

23%

23%

23%

23%

24%

24%

24%

24%

24%

24%

24%

Condition Summary Table - SCRIM

Road Type

SCRIM PI

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Motorway

5%

4%

4%

4%

4%

4%

4%

4%

4%

4%

Dual APTR

13%

12%

12%

12%

12%

12%

12%

12%

12%

13%

Single APTR

29%

29%

29%

29%

29%

29%

29%

29%

29%

29%

Overall

24%

24%

24%

24%

24%

24%

24%

24%

24%

24%

Road Type

SCRIM PI

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Motorway

5%

5%

5%

5%

4%

4%

4%

5%

5%

5%

5%

Dual APTR

13%

13%

13%

13%

13%

13%

13%

13%

12%

13%

13%

Single APTR

29%

29%

29%

29%

29%

29%

28%

28%

28%

28%

29%

Overall

24%

24%

24%

24%

24%

24%

23%

23%

23%

24%

24%

Scenario 3: 40% reduction in current expenditure to £27.84m

Work Area Table Total

Maintenance Activity

Area of Work (m2)

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Reconstruction

273896

274806

277014

282331

334874

320566

343175

352315

346797

358455

Strengthening

681597

681012

668298

658677

411039

489834

384453

344956

371159

307286

Surface dressing

507730

508762

515065

514426

513635

514194

513587

513889

513668

513625

Maintenance Activity

Area of Work (m2)

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

Reconstruction

419860

493935

562282

618259

698304

712208

738233

746641

754809

776666

Strengthening

448145

389555

376519

425401

355428

380299

358981

415156

477915

480151

Surface dressing

375014

401214

401532

402501

403142

403969

404794

405521

406036

406562

Financial Plan Table Total

Maintenance Activity

(£m)

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Reconstruction

9

9

9

9

13

12

13

14

13

14

Strengthening

15

15

15

15

11

12

10

10

10

9

Surface dressing

4

4

4

4

4

4

4

4

4

4

Total

28

28

28

28

28

28

28

28

28

28

Maintenance Activity

(£m)

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

Reconstruction

16

20

23

25

29

30

31

31

31

32

Strengthening

12

12

13

14

14

14

14

16

17

17

Surface dressing

3

3

3

3

3

3

3

3

3

3

Total

32

35

39

43

46

48

49

50

51

52

Condition Summary Table - Deflectograph & SCANNER

Road Type

Deflectograph & SCANNER PI

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Motorway

21%

27%

27%

29%

31%

31%

31%

31%

30%

29%

Dual APTR

18%

22%

22%

24%

27%

28%

29%

31%

30%

32%

Single APTR

9%

11%

11%

12%

15%

16%

17%

19%

19%

23%

Overall

11%

14%

14%

16%

18%

20%

20%

22%

22%

25%

Road Type

Deflectograph & SCANNER PI

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Motorway

28%

27%

26%

24%

22%

19%

17%

14%

11%

9%

6%

Dual APTR

31%

32%

32%

32%

32%

31%

31%

31%

30%

30%

29%

Single APTR

23%

24%

25%

26%

27%

28%

29%

30%

30%

31%

32%

Overall

25%

26%

26%

27%

27%

28%

28%

29%

29%

29%

29%

Condition Summary Table - SCRIM

Road Type

SCRIM PI

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Motorway

5%

5%

5%

5%

4%

5%

5%

5%

5%

5%

Dual APTR

13%

13%

13%

13%

13%

13%

13%

13%

13%

13%

Single APTR

29%

29%

29%

29%

29%

30%

29%

29%

29%

29%

Overall

24%

24%

24%

25%

25%

25%

25%

24%

24%

24%

Road Type

SCRIM PI

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Motorway

5%

5%

5%

5%

4%

4%

4%

4%

5%

5%

5%

Dual APTR

13%

13%

13%

13%

13%

13%

13%

13%

12%

13%

13%

Single APTR

29%

29%

30%

30%

30%

30%

30%

29%

29%

29%

29%

Overall

24%

24%

25%

25%

25%

25%

25%

24%

24%

24%

24%